Main storage area refurbishment - City of London

Intelligent Storage were selected by
the main contractor for clients in the City of London that required refurbishment of their main storage areas. Located in three main areas on three different floors, the items stored were of a highly sensitive nature and required individual locking facilities.

The solution provided included the design and installation of vertical plastic tambour doors with individual locking facilities that allowed separate departments to manage their own storage bays.

The three areas were all completed to programme and have proved to be very

successful as not only do they allow the safe and secure storage of system contents, but in condensing the storage to specific areas, the storage facilities have freed up valuable workfloor space for other important requirements.

before
after